Factory Direct from Dongguan · CE Certified · Est. 2008CE Certified · Est. 2008 · 18 Years Manufacturing100% Run-in Tested Before Shipment
Process family

Harness Assembly, Tinning and Auxiliary Production Machines

Not every operation on a harness line is cutting, crimping or taping. This family covers the operations that sit before and after termination and the production lines that build the surrounding components: hot-dip tinning of stranded ends, component assembly, adhesive dispensing, foaming, boxing and arranging, and battery pack assembly lines. They are specified differently from the main line — usually by cycle time per station and by how many operations a single operator can supervise. Hot-dip tinning is used where a stranded end must be closed before it enters a screw clamp or a soldered joint, because bare strands spread and unwind under torque.

Process chain

  1. 1

    Sub-assembly

  2. 2

    Component insertion / dispensing

  3. 3

    Boxing & arranging

  4. 4

    Tinning finishing

  5. 5

    Offload

The lines in this family are configured per product rather than selected from a catalogue; cycle time per station and operator count are the sizing inputs.

Choosing within this family

Specify by shift target and operator count, not by machine model.

These lines are configured, so the sizing inputs come from your production plan.

Tinning is a material decision before it is a machine decision.

Solder alloy, flux type and bath temperature are set by the terminal or the subsequent process.

Decide where inspection sits.

On a configured line, inspection can be a station or an in-line function; the choice changes the station count.

Tooling changeover follows product changeover.

If the line makes more than one product, changeover time becomes a specification, not a detail.

Auxiliary equipment should not set the line takt.

If a configured line is paced by its slowest auxiliary station, the line is mis-sized.

Frequently asked

Tinning closes a stranded end so the strands do not spread and unwind. It is used ahead of screw clamps and soldered joints, and in applications where a crimped terminal is not wanted.
No. They are configured per pack design and per shift target. We size the stations from your required output and available operators and quote the line as a project.
Two numbers drive the configuration: required output per shift and number of operators. Everything else — station count, level of automation, inspection placement — follows from those.
Yes. Tinning, caster assembly, dispensing and foaming are available as standalone machines, and the same platforms are used inside configured lines.
Standard machines and custom configurations run 7–15 days. Configured production lines are quoted as projects with their own schedule, confirmed after the layout is agreed.
Yes. Send the component or the wire and we run the operation on your part and return a video, as we do for every machine in the range.

Send us your wire and terminals

We run a free crimp test on your material and return a video before you commit.

CE CertifiedFactory Direct Price12-Month Warranty24h Quote ResponseTested Before ShipmentFree Sample Test Video
24h quote responseone engineer, not a call centre.
Pick a category first to narrow the list — your selection pre-fills the spec discussion.
No spam, no obligation. Your details stay private — one engineer replies with quotation, dies and lead time.